Description
Ensure the equipment has a pre-drilled “E” hole sized to accommodate the mounting bolt and grommet assembly.
Verify that all components are clean and free from debris.
Insert the Model VNG Isolation Grommet into the E hole of the equipment.
Ensure the grommet is seated properly, with its flanges flush against the equipment surface.
Pass the mounting bolt through the grommet and the equipment hole.
Confirm that the bolt is centered within the grommet to maintain isolation integrity.
Tighten the mounting bolt to the recommended torque specification, ensuring the grommet remains undistorted.
Avoid over-tightening, which may compromise the isolation performance.
Inspect the assembly to confirm that the grommet is properly aligned and the equipment is securely mounted.
Verify that there is no direct metal-to-metal contact between the bolt and the equipment.

Reviews
There are no reviews yet.